Posted July 27, 2020 at 2:48 pm by isofo81@gmail.com

Biogas Plant For Sale in Greece

Biogas plant 120 kw under 14-year remaining contract to the grid (price per kw: 0.209 euro-24hrs*120kw*0.209€/kwh*80%efficiency≈480€/day). The plant is situated in an owned 5300 m2 field just next to the public power corporation plant in Agios Dimitrios, Kozani, Greece. The plant is built at just about half of the field for future expansion in power with a second generator (with a small cost-at the same kW price up to 3 MW) given the advantage of having two digesters tanks already or other activity (e.g. greenhouse). Main building 160 m2, cummins engine/ camda generator 120 kw (with engine service parts available when actually needed in stock by a service engine company in Greece), two digesters of 675 m3, liquid/solids separator, two temporary storage tanks 280 m3 and 150 m3, gas filtration, loader, feeding tank 15 m3 and 80 m3, temporary feeding tank 13 m3, weighbridge and several types of machinery and parts (steel tank, pelletizer, air compressor, drum filter, engine parts, pumps, etc). The plant is eligible and already participated in EU funded research programme (significant funds already have been paid – also applied for another one) with an important team of universities, private companies and local consultants for innovations and improvements in existing facilities like ours. Easy steady feeding provided by reliable partners with vegetable and animal fats/oils giving the very high gas yield and others such as chicken manure, food waste, vegetables etc) providing quality solid and liquid fertilizers.

 

Greece is a great country to do business. Be your own boss by taking over an existing business than starting a new business if you are unsure how to start a company. Business for sale in Greece is your best choice and you can look for our business broker for assistance or business advisor to advise you further in your business needs.

Details

Total Revenue
185000
Net Profit
100000
Company Establish Year
2014
Ownership
Full-Time
Total no. of Employees
2
Reason for Letting Go
disagreement with business partner
Physical Location Status
rural area
Potential for Expansion
The plant is built at just about half of the field for future expansion in power with a second generator (with a small cost) given the advantage of having two digesters tanks already or other activity (e.g. greenhouse). The electricity price for biogas plants up to 3 MW is still high at 0.209 euro/kWh (for instance a photovoltaic park of <500 kW has a price of less than 0.07 euro/kWh) and it is solid as biogas plants in Greece are promoted for faster grid connection and their total power has to be increased a lot in Greece\\\\\\\'s new green environmental policy.